The Fence Mural That Humbled Me: Everything I Learned From a 2-Day Project That Turned Into 4

I think there’s a lot of pressure as a business owner to only show the wins.
The finished mural.
The pretty pictures.
The happy client.
The perfectly edited Reel that makes it look like you showed up, painted something beautiful, packed your brushes and went home.
This is not that story.
Well, it does end with a beautiful mural and an amazing client. But getting there involved 105-degree heat, a surprise fence surface, an emergency trip to Lowe’s, buying my fifth paint sprayer, an unexpected hotel stay, mosquito bites, a thunderstorm, a natural gas plant getting struck by lightning (did not affect the mural install in any way, shape, or form…. Purely here for fun fact), and a two-day installation somehow turning into four trips to Tulsa.
I learned more from this mural than I probably could have learned from ten projects that went exactly according to plan.
So, here are the lessons from the fence mural that humbled me.
First Win: My Client Found Me Through ChatGPT
Before we get into everything I did wrong, I have to start with something I thought was incredibly cool:
This client found me through ChatGPT!
They were Airbnb owners in Tulsa, Oklahoma, looking for a muralist and collecting quotes from multiple artists. Somehow, their search led them to me. As someone building a mural business, that alone felt like a win.
We went back and forth on pricing. My original quote was on the higher side, the client countered, and I gave them my absolute lowest number—the point where I knew I could still make the project work based on the square footage, design complexity, travel and surface.
For reference, my mural pricing considers three major things:
Square footage
Surface type
Design complexity
The design itself had already been created by an outside design company (shoutout Somerled Designs), and the fence was approximately 8 feet tall by 30 feet wide. Most importantly, I had a photo of the fence.

Or so I thought…
Lesson #1: Never Assume Two Fences Are the Same
The original photo showed the flat side of a privacy fence. The wooden slats were lined up evenly beside each other without posts protruding toward me. Based on that surface, I built my entire installation plan.
I was going to roll the primer. I’ve painted fences before, and rollers work great on that type of surface. They give me a solid layer of primer quickly and efficiently. So, with that, I packed accordingly.
The day before install, I reconfirmed exactly where I would be painting because the client wasn't going to be there when I arrived. This is when I learned they actually wanted the mural on the a different fence: the fence directly in front of you when you walk into the backyard rather than the fence shown in the original photograph.
The client planned to send me an updated picture, but unfortunately that photo never came through.
And here is where I made my mistake:
I didn't follow up.
I assumed the other fence would have the same construction.
It did not.
When I arrived in Tulsa, I found alternating fence slats at different depths. I remember looking at it and immediately thinking: Well, shit. This changes things.
The rollers I had planned to rely on were suddenly wildly inefficient, but I tried anyway. After spending more than an hour getting through only a small portion of the fence, I knew continuing wasn't going to work. I had only budgeted two days for this installation, and I needed a new plan.
Lesson #2: Sometimes You Have to Make the Call On-Site
I stopped. I drove to Lowe's. I bought another paint sprayer.
For anyone keeping track, this is now paint sprayer number five in my inventory.
Was buying another sprayer part of my project budget? Absolutely not. But driving 90 minutes home to grab one wasn't exactly a great option either.
Changing from rolling to spraying also meant buying everything else that came with the new plan: an extension cord, paint cup liners, additional overspray protection and miscellaneous supplies I hadn't planned to need. Then I went back to the property and started over with my new approach.
And it worked!
The primer went on dramatically faster. Did my sprayer clog multiple times because I was spraying thick primer in extreme Oklahoma heat? Of course it did. So now I was also troubleshooting and unclogging a paint sprayer on-site. But I was moving again.
And that is one of my biggest lessons from this project: Preparation matters, but adaptability matters just as much.
There will be moments when the plan you carefully created simply isn't going to work.
You have to be willing to recognize that quickly, stop wasting time trying to force it, and make a new plan.

Lesson #3: Efficiency in the Beginning Saves HOURS at the End
Once the primer was down, I traced the design onto the fence using my Meta Quest VR setup and started laying in my block colors. And then I made another mistake. Instead of painting through certain areas that I knew would eventually be covered by another color, I carefully stayed inside every traced section. That sounds like a good thing.
It wasn't.
Because of the alternating depths of the fence slats, I was doing significantly more brushwork than expected. Trying to carefully block every individual section slowed me down and ultimately created more cleanup work later.
Looking back, I should have thought several steps ahead. Where can I intentionally overpaint because another color will cover this later? Where do I actually need a clean edge right now? Which details matter during this phase, and which ones absolutely do not? I was painting what was directly in front of me instead of thinking about the entire installation sequence.
That lesson alone has changed the way I'll approach future murals.
Lesson #4: Oklahoma Heat Does Not Care About Your Schedule
Day one was forecast to reach 104 degrees.
I thought I was prepared.
Lots of ice water.
Sunscreen.
A hat.
Extra clothes.
Access to the client's air-conditioned house.
Bug spray.
I knew it was going to be miserable, but I thought I could handle it. I pushed myself much further than I should have. I was sweating constantly, I started getting dizzy, and my balance was off. I drank water all day and peed once because I was sweating out practically everything I consumed.
At one point, I started dipping my towel into the client's pool and wrapped it around my neck just to try to cool myself down. Around 2 p.m., I finally admitted that continuing without a real break was a bad decision.

I left the property, sat in air conditioning, ate lunch and gave my body about an hour to reset. I also ran to Target and bought a neck fan so I could at least have constant airflow while I painted. When I returned, the sun was finally starting to shift and shade began creeping across the fence.
My productivity changed almost immediately.
That experience taught me something that should have been obvious:
A 12-hour painting day in comfortable weather and a 12-hour painting day in 104-degree direct sunlight are not the same 12 hours.
Extreme weather needs to be considered when estimating labor and scheduling—not just whether the paint technically can be applied in those conditions. And no mural is worth putting myself in danger to stay on schedule.
Lesson #5: Pack for the Project You Planned—and the One You Didn't
Remember how I planned to drive home after day one and bring my ladder and step stool back for detail work on day two? Yeah. That was another lesson. Because I suddenly needed them on day one.
I improvised and used my rolling kit as a step stool. It worked. Was it ideal? No. I had also planned to continue painting after sunset using the client's patio lighting. Normally, I travel with a large work light. Guess what I didn't bring? The light.
Then, through a completely innocent series of events, the client accidentally locked everyone out of the house when leaving the property. Suddenly my plan to work into the evening disappeared.
Now I was racing the sun.
And while I was racing the sun, I made another tiny decision that I regretted almost immediately. My bug spray was in my car. I remember thinking that going to grab it would cost me another couple minutes of daylight. So I kept painting.
Do you know what loves Oklahoma evenings more than muralists?
Mosquitoes.
I got absolutely eaten alive.
I woke up the next morning covered in bites and bruises from scratching them in my sleep. Go get the bug spray. The mural can wait two minutes.
Lesson #6: Know When the Original Plan Is No Longer the Safe Plan
My original plan was to drive 90 minutes home that evening and then drive another 90 minutes back to Tulsa the next morning. By the end of day one, I was completely depleted. I would have arrived home late enough that my daughter was already asleep. I would have seen my husband for maybe 30 minutes before going to bed, only to wake up and immediately drive back.
More importantly, after spending the day painting in 104-degree heat, I didn't feel like driving 90 minutes was the safest choice. So I changed the plan again. I booked a hotel room down the road from the client's property.
Thank God I had packed extra clothes and toiletries.
The hotel wasn't in my original project budget. Neither was the sprayer. Neither were the extra supplies. But sometimes running a business means recognizing when sticking stubbornly to the original plan is actually the worse business decision.
Day Two: Smarter, Faster...Still 105 Degrees

I started day two much better prepared.
Ice water ready.
Neck fan charged.
A better understanding of the fence.
A better painting sequence.
And a much better respect for the temperature—which somehow managed to reach 105 degrees.
I also changed when I took my break. Instead of waiting until 2 p.m. when I was already completely drained, I stopped around 11:30. I gave myself roughly 40 minutes in air conditioning to eat, cool down and reset. That break wasn't wasted time; It made the hours afterward more productive.
I moved significantly faster on day two, but I had already lost too many hours during day one. The reality eventually became unavoidable: I wasn't finishing in two days.
Lesson #7: Sometimes the Timeline Is Just Wrong
This one was hard for me.
I had estimated two days. I wanted it done in two days.
But wanting something to fit into the timeline doesn't magically create more daylight, change the surface or lower the temperature. I needed a third painting day. Unfortunately, I couldn't simply return the following morning. My husband was leaving town and I was on single-parent duty.
Eventually, I coordinated childcare with my neighbor so I could make another trip to Tulsa and finish the mural. I planned for about half a day. And then Oklahoma decided I hadn't learned enough yet.
Lesson #8: You Cannot Negotiate With Weather
On my drive to Tulsa for day three, a massive thunderstorm rolled through. This was a wooden fence. You cannot paint a soaking wet wooden fence. By the time I arrived in Tulsa, it was still storming so badly that lightning struck a natural gas facility in the area and it caught fire (again… this has nothing to do with the mural).
So there I was, sitting in a Starbucks, watching hours of my planned painting time disappear. And there was absolutely nothing I could do about it. Eventually the storm moved through, the sun came out, the Oklahoma heat returned with a vengeance, the fence dried, and I was finally able to get back to work.
I completed the remaining details that day, and I returned the following day to seal the mural (which took about 30 minutes). Thankfully, I was already heading to look at another Airbnb property for another contracted mural, so that final Tulsa trip wasn't solely for this project.
Still: Two planned days became four trips.
And This Is Why You Need a Contract
This project exposed some gaps in my business processes that I am genuinely grateful to have discovered. Not because anything went wrong between me and the client—it didn't.
These clients were WONDERFUL!
But a good contract isn't something you create because you expect your client to be difficult. A good contract exists because projects change.
Surfaces change.
Scope changes.
Weather changes.
Access changes.
Timelines change.
Unexpected expenses happen.
And sometimes the information you used to create your original quote is no longer the information you're working with when you arrive.
Going forward, my contracts and quoting process need to better account for those realities:
If the project surface changes after a quote has been provided, I need the ability to reassess the project.
If the client changes the scope, dimensions, location or surface, I need the ability to adjust pricing when those changes affect labor or materials.
If a change creates additional travel, lodging, equipment, materials or installation days, those costs can't automatically become mine to absorb.
And weather delays—especially for exterior murals—need to be clearly addressed.
Contracts aren't just about protecting yourself from bad clients. They're about creating clarity with good ones.
My Biggest Process Change: Verify the Actual Surface
The biggest operational change I'm making is incredibly simple: Whenever possible, I want to see the site before I quote or install. For projects where a site visit isn't practical, I need current photos of the exact surface I will be painting.
Not another fence on the property.
Not something similar.
Not a photo from six months ago if construction has happened since.
The actual surface.
And if the painting location changes after quoting?
New photo.
No assumptions.
That tiny process change could have completely changed how I prepared for this installation. I would have packed:
The sprayer.
The extension cord.
The ladder.
The step stool.
The work light.
Masking materials.
And, for the love of everything, the bug spray would have been right next to me.
The Most Important Part: My Clients Were Amazing
I want to make something extremely clear. None of this is me blaming my clients.
Quite the opposite.
They were fantastic. They gave me access to their home so I could escape the heat and cool down. They were incredibly kind throughout the entire process. I got to meet their family. They were understanding as the installation evolved, and most importantly, they loved the finished mural.
I loved working with them.
The mistakes in this story are mine. I'm still growing as a muralist and as a business owner. Every project teaches me something that makes the next project better.
And I'm okay saying publicly that I don't know everything yet.
I don't think experience means you eventually reach a point where nothing goes wrong. I think experience means that when something does go wrong, you recognize it faster, know what options you have, adapt without panicking and build a process that makes it less likely to happen again.
Would I Call This Project a Failure?
Absolutely not.
I actually consider it a huge win.
I walked away with:
a beautiful mural for my portfolio.
I worked:
with clients I genuinely enjoyed.
I proved:
to myself that I could problem-solve when almost nothing about the installation went according to my original plan.
I learned:
Where my quoting process needed improvement.
What needs to change in my contracts.
How differently I need to schedule extreme-heat installations.
What belongs in my vehicle even when I don't think I'm going to need it.
That sometimes being a professional artist looks less like standing peacefully in front of a mural with a paintbrush and more like standing in Lowe's, covered in sweat, buying your fifth paint sprayer and completely redesigning your installation plan in your head.
And honestly? I'll take those lessons. Because every mural teaches me how to paint better. Projects like this teach me how to run my business better.
And that lesson might be worth even more.
Love,
LTMR Designs